£

cart

Cart is empty

Sub total:
total:

Goodridge is closed until the 2nd January 2025. All orders will be shipped and processed after we return. We wish everyone a Merry Christmas and a Happy New Year.

Assembly Instructions for Re-Usable 600 Series Hose and Fittings

600_01.jpg__PID:9d9a1dae-6579-4b8a-ad79-8f011cb2dc75

STEP 01

Using a fine tooth saw blade or cut off wheel, cut hose to the required length. Clean any loose debris from both the cut ends and inside the hose.
Note: Lubricate threads with Duck Oil before assembly. (or a similar commercial lubricant may be used)

600_02.jpg__PID:f6ee8a87-fa01-401f-af71-ddf874f13967

STEP 02

Main fitting body - Olive - Socket

On a clean flat surface disassemble the fitting, this consists of 3 parts, the main fitting body, olive and socket.

600_03.jpg__PID:d83752c7-eaa0-4783-9ab3-36eec38ad8f7

STEP 03

Push two sockets back to back over the overbraid working from the non flared end

600_04.jpg__PID:0f233437-107e-4172-9d38-e0d93ad0221a

STEP 04

Using an appropriate sized

Goodridge mandrel, flare out both ends of the stainless steel overbraid from the PTFE inner tube

600_05.jpg__PID:40e27f18-5181-441d-bafa-5b5a975f9796

STEP 05

Push an olive onto each end of the PTFE inner tube under the stainless steel over braid by hand and finish off by pushing against a flat solid surface making sure the PTFE tube is fully home in the olive.

600_06.jpg__PID:531ea312-d69b-475a-9cad-b76b1e6a9b3e

STEP 06

Holding the main fitting body in a smooth jaw vice, lubricate the thread and push the hose over the nipple end and start to thread the socket onto the fitting by hand.

600_07.jpg__PID:06582cd6-332d-4853-821a-8766c58fe17f

STEP 07

Finish tightening the socket onto the fitting with a good qualityspanner until the socket is one full turn from the main fitting hex.

PRESSURE TEST

600_08.jpg__PID:04b58725-0b8e-42e7-92b4-3c6eef2b9b3f

STEP 08

UNDER NO CIRCUMSTANCES SHOULD THE SOCKET BE LOOSENED IN AN ATTEMPT TO ADJUST THE ALIGNMENT AFTER ASSEMBLY