£

cart

Cart is empty

Sub total:
total:

Goodridge is closed until the 2nd January 2025. All orders will be shipped and processed after we return. We wish everyone a Merry Christmas and a Happy New Year.

Assembly instructions for the 236/366 fittings and 200/210 Series hose

236_01.jpg__PID:518805fb-d7ae-4a8e-9d9e-345e7c5101ee

STEP 01

Bind masking tape tightly around the hose at the required length and cut through using a fine tooth saw blade or cut off wheel, leaving tape on both ends so that it retains the braid. Clean any debris from both the cut ends and inside the hose.

236_02.jpg__PID:0e2a3968-0b00-4d51-a8c7-d75866d4c185

STEP 02

Socket (red) Main fitting body (blue) On a clean flat surface disassemble the fitting. This consists of two parts.

Tip:
Wrap some tape behind the socket to identify if the hose is being pushed out of the socket when tightening.

236_03.jpg__PID:c4cb9b55-2c9e-426d-9b04-e9c622065ed9

STEP 03

Hold the socket in a smooth jaw vice and feed one end of the hose into the socket by turning clockwise and pushing until the hose finishes just behind the socket threads.

236_04.jpg__PID:a80c1f38-3704-47e0-a61b-63b349151411

STEP 04

Holding the main fitting body in the vice, lubricate the thread and push the hose and socket over the nipple end and start to thread the socket onto the fitting by hand.

236_05.jpg__PID:99219f56-c184-40df-8cea-613ebb44dea8

STEP 05

Finish tightening the socket onto the fitting using a good quality wrench until the socket is one full turn from the back of the of the fitting hex.

236_06.jpg__PID:1aa37cb9-5540-47e9-b425-509df89b7c09

STEP 06

Pressure test.