£

cart

Cart is empty

Sub total:
total:

Goodridge is closed until the 2nd January 2025. All orders will be shipped and processed after we return. We wish everyone a Merry Christmas and a Happy New Year.

Assembly Instructions for the 811 Fittings and 910 Series Hose

811_910_01.jpg__PID:4f9902ed-cbf0-49cb-8f59-ab2b74a45ee2

STEP 01

Remove socket from fitting and ensure the hose has clean square cut ends.

811_910_02.jpg__PID:d038bc41-fd79-4817-a27c-8cbd8bd293c9

STEP 02

Feed the hose into the socket with a turning motion, feeding the braid in as you turn the hose.

811_910_03.jpg__PID:93c95b42-345a-4d70-ade7-4fc6f14ff4a7

STEP 03

Hold the fitting in a vice with smooth or soft jaws, and lubricate the threads with a light oil.

811_910_04.jpg__PID:f4a739e1-4ef9-4b7c-8268-6e5d6476f9c4

STEP 04

Push the hose firmly onto the thread whilst rotating the hose and socket together. Hand tighten both the hose and socket until it becomes too tight to move.

811_910_05.jpg__PID:f9c465a7-9fde-4f61-bbbd-90b3655a1c55

STEP 05

Finish tightening the socket using an aluminium spanner, continue turning the socket until it reaches the base of the thread.

811_910_06.jpg__PID:1c558b66-bbbe-4099-8d43-b6e00f81651f

STEP 06

When the socket reaches the base of the thread keep turning for an extra 1.5 complete turns.